In 2015, we were asked by Cass County Electric Cooperative to tear out their old glue down carpet, remove the old adhesive, and install their Congoleum VCT Flooring. We used Ardex Feather Finish over the concrete floor after scraping the adhesive to have a super smooth floor so that there were no imperfections under the tile.
The project was approximately 400sqft but took around 2 days to perform as there was Johnsonite Vinyl Base to install as well as transitions. This was done over a weekend so as to not impede their operations. A client could expect to pay $6/sqft for materials and labor, with 20% more for weekend flooring installation.
This installation was done in Valley City, North Dakota.